Long Tunnel Inspection

Ocean Modules has completed a long tunnel inspection of the Forsmark nuclear power plant cooling water system. The survey was commissioned by SUAB. The penetration goal was 1450 m. By the end of the survey over 1700 m had been successfully inspected.

The Ocean Modules V8 Sii long tunnel inspection solution is a light, mobile, fiber optics-based platform with a reach of up to 2500 m.

Long Tunnel Inspection

Recent News

ROVPACK Unveiled

Ocean Modules has demonstrated a new backpack concept for light ROV transportation, making jobs in water towers, small platforms and confined spaces even simpler and safer.

Read More

First RESROV sold

Ocean Modules has kicked off the push into drinking water reservoir and hot water system inspection services together with K.A.J. Dykkertjenste AS, representing 25 years of experience in the market.

Read More

HOTROV and RESROV Launched

Today, Ocean Modules announces two new ROV concepts specicfially for safe and painless inspections of drinking water reservoir tanks and hot water systems.

Read More

V8 Sii ROV Technicians Certified

Two technicians from Seismic Asia Pacific have completed training for the correct operation, handling, maintenance, servicing, and fault-searching of the V8 Sii range of remotely operated vehicles.

Read More

View Older News

ISO 9001:2000 Certified